Metropolitan River Protection Act

Protecting the Chattahoochee River in Metro Atlanta

The Chattahoochee River is the largest river in metro Atlanta and one of the region’s most valuable resources, serving as the primary source of drinking water for millions of residents.

In 1972, the Atlanta Regional Commission completed the Chattahoochee Corridor Study  in an attempt to quell a growing battle over the future of the Chattahoochee River in the Atlanta region. The study aimed to create a balanced, comprehensive plan for the future of the region’s most essential natural resource.

Map of Chattahoochee River Corridor
Chattahoochee River Corridor

The following year, the Georgia General Assembly adopted the Metropolitan River Protection Act (MRPA), which protected a 48-mile stretch of the Chattahoochee River between Buford Dam and Peachtree Creek by creating a 2,000 foot buffer along both banks of the river and its impoundments. The Act was amended in 1998 to extend the Corridor an additional 36 miles to the downstream limits of Fulton and Douglas counties. MRPA is codified in O.C.G.A. 12-5-440 et seq.

An interactive map of the Corridor has been developed to provide preliminary information on whether a given property may be located in the 2000-ft Chattahoochee River Corridor. Properties in this corridor are subject to development standards that may limit new land-disturbing activities. For more information, please contact the applicable local government’s planning department and the ARC, which administers the regional Chattahoochee Corridor Plan requirements.

MRPA is designed to protect the water quality and environs of the Chattahoochee River for use as:

Chattahoochee Corridor Plan

NOTICE: The Atlanta Regional Commission is proposing to amend the Chattahoochee Corridor Plan. The proposed amended document can be found here. The amended language starts on Page 5 of the document. The vote on the amendments by the ARC Board is scheduled for November 8, 2023.

MRPA directed the ARC to develop and adopt a plan to protect the Chattahoochee River Corridor and to review development proposals to ensure they are consistent with the plan. This requirement was met in 1973 with the adoption of the Chattahoochee Corridor Plan , and amended in 1998 by the adoption of the Chattahoochee River from Peachtree Creek to West Point lake Corridor Plan Study .

Under MRPA, land-disturbing activity in the Chattahoochee corridor must comply with the adopted plan to be legal. Local governments in the corridor are required to:

  • Issue permits based on ARC findings
  • Monitor land-disturbing activity in the corridor
  • Ensure that land-disturbing activity in the corridor complies with the plan

Chattahoochee Corridor Plan Goals

  • Preservation and protection of water quality as a principal objective.
  • Protection of recreational values. These values include scenic views, historic and other unique areas, and controlled public access and use.
  • Protection of private property rights of landowners.
  • Prevention of activities that contribute to floods and flood damage.
  • Control of erosion and siltation.
  • Control of intensity of development.
  • Location and design of land uses in such a way as to minimize the adverse impact of urban development on the Chattahoochee River (the “River”) and flood plains.

Chattahoochee Corridor Plan Summary

The plan establishes three sets of development standards that must be met in order to reduce the impact of development on the river.

Vulnerability Standards:

  • Based on the characteristics of the land, all land in the corridor fits one of six vulnerability categories.
  • For each vulnerability category, there is a maximum percentage of allowable land disturbance and impervious surface.
  • Land disturbance includes any activity that disturbs the land or existing vegetation.
  • Impervious surface includes any paved, hardened or structural surface, regardless of material, and includes buildings, driveways, decks, patios, pools, etc.

Buffer Zone Standards:

  • 50-foot undisturbed vegetative buffer along the river and its impoundments
  • 35-foot undisturbed vegetative buffer along flowing streams in the corridor
  • 150-foot impervious surface setback along the river and its impoundments

Floodplain Standards:

  • Balancing fill with an equal volume of cut in the river’s 100-year floodplain
  • No blocking of flood flows
  • 35-foot height limit above existing grade for all structures except bridges in the river’s 500-year floodplain

MRPA Reviews

All land-disturbing activity in the corridor must be reviewed, approved and certified for consistency with Corridor Plan standards. ARC has adopted MRPA Rules and Regulations  that explain the procedures and requirements for corridor reviews.

Review Procedures

Begin by contacting your local government to determine if a review is needed:

  • A review is required when a proposal increases the amount of land disturbance or impervious surface over existing or approved amounts.
  • A review might not be needed if the proposal does not increase existing land disturbance and impervious surface and does not affect other standards or, if the property has been reviewed previously, in which case development is allowed up to the approved limits.

When a review is required:

  • The applicant must fill out the Metropolitan River Protection Act Certificate Application  and submit it, along with all required supporting material, to the relevant local government. The required supporting documents are listed on the application and in ARC’s Metropolitan River Protection Act Rules and Regulations.
  • The local government must forward the completed application to ARC for review. ARC reviews the application to determine if it is consistent with plan standards.
  • ARC completes the review and returns its finding to the local government.
  • The local government issues a certification based on ARC’s finding, which either authorizes or denies the proposed activity.

Local Government Responsibility

  • After a project has been certified, the local government will monitor its development for conformance to the approved review.
  • Local governments are also responsible for monitoring their corridor land for land-disturbing activity that has not been reviewed or authorized.
  • Any activity that violates the terms of an approved certificate or that occurs without certification is a violation of the Act. The local government has the authority and responsibility to enforce the law and take action against violators.

Contact and Review Materials

Contact Information

To determine if proposed activities within the Corridor require review, contact your local government’s planning department or contact ARC at 404.463.3100.

MRPA Resources:

For additional information on the Metropolitan River Protection Act and the review process, please contact ARC at 404.463.3100.

Powered by ARC
33°n
CDAP
Community Planning Academy
ConnectA
Empowerline
Georgia Commute Options
Green Communities
LCI
LINK
MARC
Metro Atlanta Speaks
MNG Water Planning District
RLI
State of the Region
UASI
WorkSource GA
33°n
CDAP
Community Planning Academy
ConnectA
Empowerline
Georgia Commute Options
Green Communities
LCI
LINK
MARC
Metro Atlanta Speaks
MNG Water Planning District
RLI
State of the Region
UASI
WorkSource GA