The McDonough Livable Center Initiative (LCI) is an exciting plan that builds upon the... The McDonough Livable Center Initiative (LCI) is an exciting plan that builds upon the historic character of the community and a dynamic vision for the future. This strategy strives to fulfill the goals established by the ARC for all LCI studies including:
• Improve the mix of land uses
• Expand mobility options for pedestrians, bicyclists, and transit users
• Strengthen the network of streets and paths
• Promote a mixture of housing types and price ranges
The McDonough LCI public outreach effort was geared towards providing opportunities for citizen input while generating dialogue, enthusiasm, and excitement for the future of the community.
More
|
August 2025 |
Archived |
PDF |
|
|
This report provides status updates on projects in McDonough’s LCI project. It... This report provides status updates on projects in McDonough’s LCI project. It includes three sections: An introduction, Report of Accomplishments, and a Five-Year implementation plan.
More
|
August 2025 |
Archived |
PDF |
|
|
The document contains 10 articles and subsections providing updates to the City of... The document contains 10 articles and subsections providing updates to the City of McDonough’s Downtown Code. Its intent is to redevelop the physical infrastructure of the Town Square, utilize mixed-use development, create a vital downtown, and neighborhoods that accommodate present-day lifestyle.
More
|
August 2025 |
Archived |
PDF |
|
|
Due to Locust Grove’s location it has been identified as a prime competitor for... Due to Locust Grove’s location it has been identified as a prime competitor for economic growth along Interstate I-75. The main goal of this effort is to study efficient ways to connect the Historic Downtown business district to areas adjacent to the Tanger Outlet Center and I-75 interchange. The study focuses on designing strategic development plans for vacant land as well as infill development in the Downtown business district, preserving and enhancing the historic character of Locust Grove, providing additional housing opportunities, and improving connectivity.
More
|
August 2025 |
Archived |
PDF |
|
|
The traffic analysis document tracks estimates, traffic schematics, and traffic operation... The traffic analysis document tracks estimates, traffic schematics, and traffic operation analysis.
More
|
August 2025 |
Archived |
PDF |
|
|
The Western Parallel Connector is a proposed 2-lane urban roadway to be constructed on... The Western Parallel Connector is a proposed 2-lane urban roadway to be constructed on right of way sufficient for future widening to 4-lanes. As an alternative to I-75, the Western Parallel Connector will provide local travelers with a direct and time-saving route between Jonesboro Road and Hudson Bridge Road along the western side of I-75. The new location roadway will serve as a major collector for future developments in this largely undeveloped corridor.
More
|
August 2025 |
Archived |
PDF |
|
|
The document contains an estimate, maps, and public engagement comments regarding the... The document contains an estimate, maps, and public engagement comments regarding the 1-75 parallel connector estimate. The total estimated cost is $7,703,400.
More
|
August 2025 |
Archived |
PDF |
|
|
Henry County embarked on this planning effort to establish a long-term vision for the... Henry County embarked on this planning effort to establish a long-term vision for the study area along and to the west of I-75 in central/west Henry County, approximately 30 miles south-southeast of Atlanta. The goals of the Hudson Bridge-Jonesboro Roads Connector Activity Center are to, increase the desirability of redevelopment of land served by existing infrastructure at activity and town centers, develop a community-based transportation investment program at the activity and town center level that will identify capital projects.
More
|
August 2025 |
Archived |
PDF |
|
|
The Appendix for the activity center includes a Market Analysis, a Transportation &... The Appendix for the activity center includes a Market Analysis, a Transportation & Infrastructure Report, a Concept Plan Financial Feasibility Study, and
Public Meeting Materials.
More
|
August 2025 |
Archived |
PDF |
|
|
The document details 12 articles on Hampton’s zoning code.
|
August 2025 |
Archived |
PDF |
|
|
The City of Hampton’s decision to pursue an LCI study stems from a desire for... The City of Hampton’s decision to pursue an LCI study stems from a desire for appropriate preservation and redevelopment in its existing downtown. The planning process is intended to create a feasible vision for compact and mixed-use development supported by a diverse transportation network. The study continues, examining existing conditions, public comment, recommendations, and implementation.
More
|
August 2025 |
Archived |
PDF |
|
|
Three key components were involved in the preparation of this study: 1) developing a... Three key components were involved in the preparation of this study: 1) developing a participation process, 2) developing a study to facilitate the planning process, and 3) preparing the final plan. This updated master plan aims to build on the work done in the 2002 master plan. Key sections include a Background, Methodology, Plan Overview, 5-Year Update, Implementation, and Appendix.
More
|
August 2025 |
Archived |
PDF |
|
|
Since the adoption of Suwanee’s Old Town Master Plan in 2002, the city has... Since the adoption of Suwanee’s Old Town Master Plan in 2002, the city has successfully accomplished many of the goals and projects identified in the plan. This report details the accomplishments and progress of various Suwanee LCI Projects.
More
|
August 2025 |
Archived |
PDF |
|
|
This Downtown Master Plan is a major update to the Sugar Hill Town Center Master Plan... This Downtown Master Plan is a major update to the Sugar Hill Town Center Master Plan completed in 2005. This plan is not only designed to comply with the intent of the LCI goals but also to respond to the evolution of downtown Sugar Hill over the last decade. The master plan process provides a unique opportunity to take stock, assess and connect the incredible successes the City has achieved in planning and building a vibrant downtown future.
More
|
August 2025 |
Archived |
PDF |
|
|
The LCI study will allow the City to review and determine appropriate land uses and urban... The LCI study will allow the City to review and determine appropriate land uses and urban design options to create a mixed-use town center environment that not only supports but also encourages alternative forms of transportation. Future growth and infill development will be directed in such a manner to combat current and future transportation issues experienced in the Highway 78 corridor, including heavy pass through and commuting traffic. The district area is prime for redevelopment due to the close proximity of transportation infrastructure, economic market, and age of existing buildings.
More
|
August 2025 |
Archived |
PDF |
|
|
The appendix of the Peachtree Corners LCI study plan contains 7 sections:
LCI... The appendix of the Peachtree Corners LCI study plan contains 7 sections:
LCI Goals
Market Conditions and Opportunities – Powerpoint Highlights
Growth Projections & Market-Based LCI Strategies – Detailed Report
Existing Conditions Maps
Public Engagement Events – Detailed Summary
Online Survey Results – Detailed Summary
Transportation Conditions & Recommendations – Detailed Reports
More
|
August 2025 |
Archived |
PDF |
|
|
The impetus for this LCI study comes directly from the Comprehensive Plan as the first... The impetus for this LCI study comes directly from the Comprehensive Plan as the first major planning step to ensure the continuing maturation of the City of Peachtree Corners. The LCI study focuses on Peachtree Corners’ present conditions, public engagement process, key strategies, and action plan.
More
|
August 2025 |
Archived |
PDF |
|
|
The Park Place Activity Center Study is a multi-disciplinary planning study carried out... The Park Place Activity Center Study is a multi-disciplinary planning study carried out by the Evermore Community Improvement District with consultant assistance from Jordan, Jones & Goulding, Inc., and Ackerman & Company. Its purpose is to develop an implementable plan that will serve as a blueprint for addressing transportation, land use, economic development, and community design issues in a holistic way. The vision motivating this effort is to revive the spirit and strength of this district and the neighborhoods, businesses, and activity centers that it serves.
More
|
August 2025 |
Archived |
PDF |
|
|
The purpose of these urban design guidelines is to direct the development and... The purpose of these urban design guidelines is to direct the development and redevelopment of Norcross as it evolves. The goal is to design a physical environment that fosters community:
• by respecting natural conditions, historical patterns and precedents;
• by creating and/or preserving quality public spaces where people can gather;
• by connecting those spaces with a continuous network of safe, accessible, interesting, pedestrian-friendly streets that accommodate shared use.
More
|
August 2025 |
Archived |
PDF |
|
|
The purpose of this study is to provide an action plan for redeveloping Norcross’s... The purpose of this study is to provide an action plan for redeveloping Norcross’s historic downtown. This analysis looks at the area’s land use
characteristics, demographics, transportation infrastructure, and urban design elements. Following the analysis of existing conditions, this
report describes the public involvement process that was undertaken as part of this planning effort. Finally, the report ends with planning recommendations to achieve Norcross’s goals of redevelopment and LCI policy objectives.
More
|
August 2025 |
Archived |
PDF |